Planning result
Planning only. Final HVACD selection must use coincident sensible and latent loads, manufacturer data at your room conditions, controls/turndown, redundancy, and a qualified designer.
Why it matters
Cooling tons and moisture removal are different requirements. Hot-gas reheat can keep dehumidification from overcooling the room, but its BTU/h rating does not say how many pints of water the unit removes.
How to use it
- Enter fixture and room-equipment heat, outside air, known building load, and a sizing margin.
- Choose the humidity-system type and enter the peak room moisture load plus manufacturer-rated removal at the actual room temperature and RH.
- For hot-gas reheat, enter reheat BTU/h and airflow only to estimate supply-air temperature rise.
- For power cost, use actual input kW when possible; otherwise use full-load EER/EER2, cooling COP, or kW/ton with measured runtime and dry output.
Cannabis best practices
- Check both lights-on and lights-off conditions; plants can keep releasing moisture when lighting sensible load falls sharply.
- Do not remove standalone dehumidifiers merely because a unit has hot-gas reheat. First verify its rated moisture removal, turndown, controls, and redundancy.
- Use EER/EER2 only as a rough full-load electrical estimate. Below 65,000 BTU/h (about 5.4 tons), smaller equipment may also list SEER/SEER2; at and above that size, commercial equipment commonly lists EER and IEER. Seasonal SEER/SEER2 and weighted IEER are not exact grow-room design-point power.
Limits and sources
This is a first-pass system comparison, not an HVACD design. Coincident sensible and latent loads, outside-air humidity, psychrometrics, duct losses, infiltration, defrost, controls, turndown, redundancy, and equipment performance at room conditions require a qualified designer.
Sources
Need a calculator we do not have? Tell us what you are trying to calculate, what measurements you have, and what output would help. Request a calculator.